Scaling AI and computing has come from adding more: more compute, more energy, more infrastructure.
But the demand for AI is growing faster than the world can build the power and infrastructure to run it.
When power, memory, and hardware are the limitations, efficiency per joule becomes capacity.
Progress doesn’t have to cost the world so much.
The fair comparison: the same AI workload. Same answers. Same chip. Different computing architectures. Watch the difference in energy required to get the work done.
Each crate is a stack of finished answers. The glass column is the electricity it took to produce them. Pick a rival, press play, and watch how much each side needs.
COHERA used 735× less electricity per answer than the CPU core, and 3.5× less than the AI-specialist NPU core.
of energy, storage and large-load projects are stalled in grid connection queues worldwide. New grid infrastructure takes 5–15 years to plan, permit and complete. (IEA, Electricity 2026)
of data-centre demand already comes from AI workloads, and AI is far more than chatbots: checking payments, spotting faults, sorting sensor data. About 70% by 2030. (McKinsey)
This means that there is valuable compute that is stranded.
On a standard AI benchmark workload, measured in FPGA hardware:
lower energy per answer than a conventional RISC-V processor core, on the same FPGA board and benchmark.
lower energy per answer than AMD’s Vitis AI DPU B4096 accelerator, on the same FPGA board and benchmark.
The same work, for less than 1% of the electricity.
Measurements as of 24 September 2026.
Internal, board-level measurements on a specific AI inference workload, with outputs checked against a reference. Results are repeatable under the tested conditions and are not representative of all workloads. Programmable silicon (FPGA) means commercially available hardware configured with COHERA’s architecture, enabling real-world measurement and PCIe-based deployment without first manufacturing a custom chip.
When computing requires less energy to accomplish the same work, existing resources can support more.
More useful compute. From the resources we already have.
Every computer has a main processor. Over fifty years, each new kind of work brought a new kind of helper chip that plugs in beside it. None replaced the others; they work side by side.
Can do anything, one step at a time. It runs the computer.
Thousands of simple workers doing the same thing at once. Built for graphics, then drafted into AI.
Built for the arithmetic of AI: Google’s TPU in its data centres, NPUs inside phones and laptops.
COHERA: the efficient one. A co-processor that works beside the others, not instead of them. It takes on the work it does most efficiently, so the whole system does more with the same electricity.
It runs on programmable silicon: commercially available chips configured to run the COHERA design. That means it can go into standard servers now, without waiting for a custom chip.
111× less electricity per answer than AMD’s AI accelerator, on the same test.
NVIDIA’s GB10 is production silicon, measured in our lab on the same job. It is faster per chip than one COHERA engine running on a development board.
So we measured one COHERA engine, then calculated how many it would take to match the GB10’s speed, and how much electricity they would use.
Per answer, COHERA used about 6× less added energy than the GB10’s GPU. Matching the GPU’s speed would take about 15 COHERA engines. The multi-engine figure is a calculation from one measured engine; that chip has not been built yet.
This is our floor, not our ceiling.
Every COHERA result on this page was measured on a development board: a programmable chip far less efficient than custom silicon, with no custom chip built yet. And it still beats a modern NVIDIA chip on energy per answer.
Custom chips typically need about 12× less dynamic power than programmable ones.
The question every pilot answers: how much more useful compute can a customer unlock from the energy and infrastructure they already have?
Inside all of these, a small program looks at incoming data and decides: pass or reject, keep or discard, alert or ignore, approve or block, all day. Every one of those decisions costs electricity.
These are uses, not measurements. The numbers above are for one measured model, and a model of a different size is measured again.
Four designs ran the same image-recognition model on one development board, 1,000 images checked against the same answer key (957/1000) on every batch, electricity read at the board's 12 V input at 20 samples a second. The designs: the Cohera Co-Processor engine; an NPU core; a GPU core; and a NaxRiscv CPU core. Each is one core. Run fingerprints (sha256, first twelve): Cohera Co-Processor 7da436e99069, GPU core 410232328880, CPU core 63e293cd3848 (14 September 2026), NPU core 7483ed79d97e (16 September 2026); results file 0fcab0fa59e9. Whole-board electricity per decision: Cohera Co-Processor 17.38 µJ, NPU core 60.87, GPU core 9,207, CPU core 12,784 µJ; mean board power 10.30 · 10.20 · 10.19 · 13.05 W. The fair fight: "same work" = 600,000 answers; "same electricity" = one kilowatt-hour. The commercial-chip comparison, measured on the NVIDIA GB10 in our lab on 24 September 2026 with the identical model, test set and answer key, every run reproducing 957/1000 (pre-registered before the run): GB10 GPU, batches of 65,536, 8,570,747 decisions/s, 21.82 W above its idle on its own power sensor = 2.546 µJ per decision added; GB10 CPU, all 20 cores, 2,199,242 decisions/s; its electricity is not measurable on this machine and is estimated at 80 W added from ServeTheHome's DGX Spark review (40–45 W idle, 120–130 W with the processor loaded, whole system) = 36.4 µJ per decision; range 75–110 W added (34.1–50.0 µJ) including Jeff Geerling's Dell Pro Max GB10 review (about 30 W idle, processor maxing out around 140 W). Measuring points differ: the CPU figures are whole-system at the wall, the GPU is its own sensor, the Cohera Co-Processor is the 12 V board input. Cohera Co-Processor engine: 592,272 decisions/s and 0.4355 µJ per decision added above the board's idle (recorded); engines needed = rival speed ÷ 592,272, rounded up (15 against its GPU, 4 against its CPU), a calculation, not a built chip. "Same work" in the commercial-chip comparison = one hour at the rival's speed; "same electricity" = one kilowatt-hour of added electricity. One commercial CPU core (Cortex-X925) measured 460,535 decisions/s. AMD's Vitis AI DPU B4096 accelerator, two cores, as shipped and driven by AMD's own software, on the same FPGA board and image-recognition test, our measurement of 3 August 2026: 111× whole board against that campaign's COHERA figure. AI inference stage: on 2 September 2026 a COHERA card worked beside a GPU running a 14-billion-parameter AI model; every one of its results matched the certified reference; a correctness result, not a speed or energy result. Context figures at the top: AI workloads, training and running models of every kind, from image recognition and fraud scoring to chatbots, were about 44 of 82 GW of global data-centre demand in 2025, 54%, and could be about 155 of 220 GW, about 70%, by 2030 (McKinsey); the card calls them AI workloads, with examples. Generative AI, the fastest-growing kind, is around 40% of the total by 2030; the rest is other AI (McKinsey, AI power, 2024). Counted as workloads rather than capacity, AI was about a quarter in 2025 and could be half by 2030 (JLL). Running models (inference) was about half of AI computing in 2025 and about two-thirds in 2026 (Deloitte). COHERA’s engine is built for most kinds of AI models; large language models are the next step. US data centres used 176 TWh, 4.4% of US electricity, in 2023, and could double or triple that by 2028 (Lawrence Berkeley National Laboratory). Industry figures: Visa checks 100% of its transactions with AI; the LHC experiments record about 1,000 of 40 million collisions a second (ATLAS, CMS); 119 million smart meters are 72% of US meters (FERC, from 2022 EIA data). The 735× at the top is the fair fight’s recorded result against the NaxRiscv RISC-V CPU core, one core against one core on the same FPGA board, whole-board electricity; the 111× is the AMD measurement above. Grid queues: over 2,500 GW of renewable, storage and large-load projects are stalled in grid connection queues worldwide (IEA, Electricity 2026). Programmable chips typically need about 12 times the dynamic power of an equivalent custom chip and run about 3.2 times slower (Kuon and Rose, “Measuring the Gap Between FPGAs and ASICs”). RECORDED measured on hardware · ESTIMATE computed from recorded figures under stated assumptions.
We would welcome the chance to walk you through the measurements and explore where COHERA fits for you.
Request a 30-minute walkthrough→ jane@cohera.tech
Jane Dudley, Founder & CEO, CoheraTech, Inc. · Greater Austin, Texas
CoheraTech, Inc. is a Delaware C-Corporation, wholly owned by Cohereon Corp.